One platform for construction site intelligence

Capture your whole site, catch delays weeks earlier

Most delays surface in the weekly report long after they start. Oculo pairs passive 360° site capture with AI progress tracking, so you catch slippage weeks earlier and back every valuation with hard evidence.

ST
WD
MS
+25
★★★★★ Trusted by Morgan Sindall, Willmott Dixon,
Stepnell and other leading contractors
Integrates with
See Oculo in action.
Discover how the most flexible solution for visual data capture and AI progress tracking transforms your projects and sites.
95%
AI accuracy on progress tracking
10x
faster site capture vs manual methods
80%
lower rework costs defending claims
60+
trade teams coordinated weekly
One platform, two solutions

Capture the site. Understand the build. On one platform.

Oculo is not a camera or a dashboard. It is both, working together. Passive reality capture feeds the AI that turns your site into Project Intelligence.

The input layer

Reality Capture

Fully capture and map your site in minutes, not days.

A passive 360° walkthrough during your routine site walk creates a complete visual record, automatically geolocated to your drawings and organised over time.

  • ✓AI-powered auto site mapping, geolocated to your drawings
  • ✓A continuous 360° history you can revisit anywhere, anytime
  • ✓See behind closed walls: inspect MEP without any teardown
  • ✓Compare as-built against your BIM model, side by side
10xfaster, with 10x more data than manual capture
The intelligence layer

Project Intelligence

Know exactly what is built, what is slipping, and what to do next.

Oculo's AI analyses each walkthrough to track real progress across floors, units and trades, then flags the risks worth focusing on before they slow the schedule.

  • ✓Element-level progress tracking at 95% AI accuracy
  • ✓Detect emerging delays earlier, across every floor and trade
  • ✓Replace fragmented updates and gut feel with visual evidence
  • ✓Forecast schedule risk and where to deploy crews and materials
95%AI accuracy on progress assessment
Why teams switch to Oculo

Most site problems are visible weeks before anyone reports them.

When capture is manual and progress is a matter of opinion, the real picture only surfaces when it is too late to recover. Here is what that costs.

Hours

Capture eats your team's time

Manually photographing a large, complex site swallows hours every week, and still leaves blind spots and missing records exactly when you need them most.

Weeks

Slips surface too late to recover

When progress reports rely on memory and selective photos, the real picture surfaces weeks after the slip began. Site reality typically runs 3 to 5 weeks ahead of weekly reports, and by then recovery is twice as expensive.

Disputes

Progress is a debate, not a fact

Subcontractors say it is done, your tracker says it is not, and no one has the evidence to settle it. Without verified progress you overpay and disputes drag on.

How Oculo works

From site walk to verified progress in three steps.

No new process for your site teams. Works with or without a BIM model. Just continuous site capture feeding AI that tracks progress and forecasts schedule risks before they become reality, so you can prevent them.

01

Capture the site, passively

A simple 360° camera walk-through during routine site visits. No interruption to your crews, just continuous capture as your team moves through the building.

02

AI tracks progress automatically

Our AI provides an objective assessment of progress and automatically identifies delays and key risks to focus on. Stop debating opinions and start discussing solutions.

03

Forecast your schedule risk

See exactly which activities are slipping, what it will take to get back on track, and where to deploy crews and materials. Catch slippage at week 3, not week 8.

Built to fit how you already work

One source of truth your whole site can act on.

Run site meetings remotely, settle questions with evidence, and push issues straight into the tools your teams already use.

Remote site inspection

Complete a site inspection in minutes, not hours, and assign tasks without leaving your office.

Integrates with your CDE and field tools

Market-leading integrations with Autodesk, Procore and Fieldview let you raise issues straight from Oculo.

Audit-ready evidence trail

Time-stamped visual evidence supports valuations and prevents claims and disputes.

Reports in seconds

Create site reports and schedules of condition in seconds, and export any or all issues and observations to PDF or Word.

In their own words

What construction leaders say about Oculo.

I feel listened to. It's been a two-way street. We are making changes and developing the system together, not only for the better of us, but for the whole industry.
Lovell Partnerships
Chris Wallace
Construction Director, Lovell Partnerships
I can see, and demonstrate, exactly what had been done when. Once everybody knows what the tool can do, the whole mindset shifts to become more collaborative and transparent.
Meldrum Group
Dave Meldrum
CEO, Meldrum Group
Having Oculo's 360° visuals is a massive benefit to us as a business. When issues arise we want to be 100% sure that we've done everything right, and your system underpins that.
Willmott Dixon
Senior Operations Manager
Willmott Dixon
Oculo provides a solution that's easy to use. They are harnessing digital technologies incredibly well into a sector that's typically fairly basic in its use of digital platforms. They don't overcomplicate, simple to set up and use.
Overbury
Senior Project Manager
Overbury
Real projects, real numbers

What teams ship with Oculo on real sites.

Lovell Partnerships multi-unit residential build with Oculo lime AI progress overlay
700+
photos saved per scan

On a 140-apartment scheme, Lovell's PM cut documentation from 5+ photos per apartment to one click per room, saving weeks of PM time and giving a complete visual record across the build.

Lovell Partnerships · Multi-unit residential
HB Reavis Varso Tower with Oculo lime AI progress overlay across floors
60+
subcontractors coordinated weekly

Building the EU's tallest commercial building, Varso Tower, 310 metres. Oculo gave the team objective, time-stamped evidence to settle disputes and verify completion across hundreds of workers on site daily.

HB Reavis · Varso Tower, 310m
Oculo vs spreadsheets and manual photo logs

Replaces hours of manual reporting with verified progress, at a price you can afford, unlike expensive legacy progress trackers.

Capability
Manual / spreadsheets
Oculo
Time to detect delay
✕6 to 8 weeks
✓1 to 3 weeks
Progress data source
✕Self-reported, subjective
✓AI-verified visual evidence
Subcontractor valuation backup
✕Photos in folders
✓Time-stamped audit trail
Multi-unit complexity
✕Spreadsheet sprawl
✓Portfolio-level oversight
Audit-ready evidence trail
✕Manual collation
✓Golden thread, ready-built
Book your demo

See exactly how Oculo tracks progress and flags risk.

  • ✓30-minute walkthrough on examples from your sector
  • ✓See how verified progress prevents subcontractor overpayments
  • ✓Get pilot scope and pricing for your portfolio