Switch on a 360° camera, walk the site as you normally would, and build a complete visual record, removing the blind spots across your site. Inspect it, compare it, and use it as evidence from anywhere, long after the walls are closed.



Phone photos and memory don't hold up when a claim lands or a wall is already closed. Here is what that costs.
Walking a site with a phone camera takes hours every week, and still leaves gaps exactly where you will need the record later.
Months later a variation or defect claim arrives and you cannot prove what was built, or when. Without a record, you absorb the cost.
Central, design and commercial teams lose days travelling for inspections a complete digital twin could handle remotely.
No specialist team, no stopping work, and no BIM model required. Just a 360° camera on your routine site walk, and AI doing the rest.
A simple 360° camera walk-through during routine site visits. No interruption to your crews, just continuous capture as your team moves through the building.
Oculo automatically geolocates the capture to your floor plans, building a continuous, searchable 360° history of the whole build.
Revisit any date, compare as-built against your BIM model, and settle disputes with time-stamped evidence, without going back to site.
For the project, commercial and design teams who carry the risk when the record is thin.
Continuous capture without stopping work, floor by floor, unlike competitors that require teams to stop and document each section.
Inspect MEP and structure above and beneath the surface, with no teardown, long after it has been covered up.
Side-by-side as-built versus model, so you spot deviations early and have an objective reference for variations and claims.
Triage the site and raise issues remotely, with market-leading integrations to Autodesk, Procore and Fieldview.
On a 140-apartment scheme, Lovell's PM cut documentation from 5+ photos per apartment to one click per room, saving weeks of PM time and giving a complete visual record across the build.
Building the EU's tallest commercial building, Varso Tower, 310 metres. Oculo gave the team objective, time-stamped evidence to settle disputes and verify completion across hundreds of workers on site daily.


