Most delays surface in the weekly report long after they start. Oculo pairs passive 360° site capture with AI progress tracking, so you catch slippage weeks earlier and back every valuation with hard evidence.



Oculo is not a camera or a dashboard. It is both, working together. Passive reality capture feeds the AI that turns your site into Project Intelligence.
A passive 360° walkthrough during your routine site walk creates a complete visual record, automatically geolocated to your drawings and organised over time.
Oculo's AI analyses each walkthrough to track real progress across floors, units and trades, then flags the risks worth focusing on before they slow the schedule.
When capture is manual and progress is a matter of opinion, the real picture only surfaces when it is too late to recover. Here is what that costs.
Manually photographing a large, complex site swallows hours every week, and still leaves blind spots and missing records exactly when you need them most.
When progress reports rely on memory and selective photos, the real picture surfaces weeks after the slip began. Site reality typically runs 3 to 5 weeks ahead of weekly reports, and by then recovery is twice as expensive.
Subcontractors say it is done, your tracker says it is not, and no one has the evidence to settle it. Without verified progress you overpay and disputes drag on.
No new process for your site teams. Works with or without a BIM model. Just continuous site capture feeding AI that tracks progress and forecasts schedule risks before they become reality, so you can prevent them.
A simple 360° camera walk-through during routine site visits. No interruption to your crews, just continuous capture as your team moves through the building.
Our AI provides an objective assessment of progress and automatically identifies delays and key risks to focus on. Stop debating opinions and start discussing solutions.
See exactly which activities are slipping, what it will take to get back on track, and where to deploy crews and materials. Catch slippage at week 3, not week 8.
Run site meetings remotely, settle questions with evidence, and push issues straight into the tools your teams already use.
Complete a site inspection in minutes, not hours, and assign tasks without leaving your office.
Market-leading integrations with Autodesk, Procore and Fieldview let you raise issues straight from Oculo.
Time-stamped visual evidence supports valuations and prevents claims and disputes.
Create site reports and schedules of condition in seconds, and export any or all issues and observations to PDF or Word.





On a 140-apartment scheme, Lovell's PM cut documentation from 5+ photos per apartment to one click per room, saving weeks of PM time and giving a complete visual record across the build.

Building the EU's tallest commercial building, Varso Tower, 310 metres. Oculo gave the team objective, time-stamped evidence to settle disputes and verify completion across hundreds of workers on site daily.